Description
Magnificent "Turnkey" villa offers a unique and incredible opportunity to purchase a detached, single-story villa.
Located on a plot of land measuring 1500sqm, divided into two parts (905.42sqm + 594.58sqm).
One part of the plot of land has 905.42sqm in the area of the house and includes a garage for 2 cars, outbuildings with a full bathroom and a storage room, a pergola with barbecue for a living area overlooking the pool and deck.
The other part of the land has 594.58sqm of agricultural/orchard area.
This villa was carefully planned to integrate outdoor spaces with a swimming pool, large social areas and surrounding nature, providing quality of life. The construction of this house is based on an innovative, highly efficient structural and thermal construction system that saves energy (A+ energy certificate), promotes effective acoustic insulation, active breathing and resistance to fire and parasites.
The house features:
- An open-space concept kitchen, integrated with a dining and living room, adorned by a high ceiling that expands the feeling of space and light;
From an aesthetic point of view, both inside and outside, this villa offers a harmonious combination of natural elements, such as wood and stone, together with neutral tones and vegetation, creating an environment of serenity and sophistication.
Located in the municipality of Vagos, this is a haven of tranquility with privileged access, just 400 meters from the EN 109 and 1 km from the A17. Furthermore, it is conveniently situated within a short drive of Praia do Areão and Praia da Vagueira (15-18 min), the city of Vagos (12 min) and the picturesque city of Aveiro (20 min).
The Engineering and Construction Company specializes in Sustainable Construction, with a solid foundation in the construction sector, committed to providing you with a home that not only meets the highest standards of quality and comfort, but also promotes energy efficiency and respect by the environment. Furthermore, complete transparency and trust are guaranteed at all stages of the construction process.
The execution of this project is scheduled for 18 months (maximum).
Finishes:
- Construction of housing with the AREASYSTEMS system – Sustainable Houses:
The execution of this project is scheduled for 18 months (maximum). Expected key delivery date: end of 20255
Come and see your new home and end 2025 with a bang!